Zechariah Boodey Farmstead Collaborative
Reflections of the past, sustainability for the future.
Navigation
Home
About
Board of Directors
Mission and Vision
History
News
Our Newsletter
Photos
Support
Donate
Volunteer
Contact
You are here:
Home
Photos
Barn Disassembly - South Profile
Previous Page
Mooney Damon Barn South Post
South Post 4 located at bent 2 interior. Braces attached to Top Plate. Tie Beam is on top of post, rafter has been removed
Mooney Damon Barn Post 4 Bent 3
Post 4 Bent 3, timbers and braces attached to post
Mooney Damon Barn Interior Post 4 Bent 4
Post 4 in Bent 4 attachment of mating timbers and braces south wall
Mooney Damon Barn South Wall Interior
Floor joists and sills in the south bays of the main floor. The large stone was holding up the floor boards. The remaining floor in the picture was not attached to the sill behind the rock.
Mooney Damon Barn Timber Frame South Exterior Wall
Materials removed revealing the timer frame structure. Removal of rafters has taken place
Mooney Damon Barn South Profile Exterior
A side view of the South Profile Timber Framing
Next Page
website by
PCS Web Design